100 YEARS OF MINING TRADITION

Throughout our nearly 100 years, we have worked together, learning at every step, maintaining confidence in our past and moving forward with the security that has consolidated us as the main iron exporter in the country.

1910

START OF OPERATIONS OF EL TOFO MINE

1918

DOCK CONSTRUCTION

1918

IMPLEMENTATION OF THE FIRST ELECTRIC TRAIN IN SOUTH AMERICA

1960

START OF OPERATIONS EL ALGARROBO MINE

1971

ACQUISITION EL ROMERAL MINES

1978

INAUGURATION OF PELLET PLANT

Pioneer plant in pellet production in Chile.

It was commissioned at the end of 1978, with a nominal capacity of 3.5 million tons of pellets per year.

1998

START OF OPERATIONS LOS COLORADOS MINE

Its main objective is to supply iron preconcentrate and Sinter Feed to the Pellet Plant.

  • It is an open-pit mine with 15-meter high benches and 6 mining phases.

2003

PELLET PLANT APPLICATION FEED MINAS EL ROMERAL

2007

START OF OPERATIONS CERRO NEGRO NORTE MINE

Its main objective is to supply iron preconcentrate and Sinter Feed to the Pellet Plant.

  • It is an open-pit mine with 15-meter high benches and 6 mining phases.

2012

START OF OPERATIONS CERRO NEGRO NORTE MINE

2014

PRODUCTION EXPANSION HUASCO VALLEY

2020

IMPLEMENTATION PROCESS RISK MANAGEMENT (PRM)

2020

FIRST BLASTING PHASE V NORTH OF EL ROMERAL MINES

2021

FIRST BLASTING PHASE VI LOS COLORADOS MINE

2022

OPERATIONAL IMPROVEMENT PORT OF GUAYACÁN

2022

HOME CONSTRUCTION TAILINGS DEPOSIT FILTERED TAILINGS FACILITY (DRF)